Optimized Boiler Package

90% Fuel to Steam Efficiency

and <9 ppm on Natural Gas

With ever rising fuel costs and their negative impact on a plant?s operating costs, stack economizers for preheating boiler feed water have never been more cost effective.

Cleaver-Brooks Optimized Boiler Packages include condensing economizers with matched combustion air fan/motor assembly delivering over 90% fuel to steam efficiency which saves you money!

Package Includes:

  • CBLE/4WI 250-800 HP high pressure steam firetube boiler


  • Combination gas and #2 oil firing


  • Hawk ICS Advanced Control system with O2 Trim


  • 2-Stage Economizer with stainless steel construction



How it Works:

The CB E++Plus two stage economizer has been precisely engineered to deliver high efficiencies when applied to new or retrofit firetube boiler packages.

Matching the economizer with the appropriate motor and combustion air fan, the E++Plus consists of two sections, the first for preheating incoming boiler feedwater before it goes to the deaerator and a second section for further heating of the feedwater after it leaves the deaerator.

This 2-stage heat transfer allows combustion gases to condense, absorbing both sensible and latent energy. This leads to significant energy savings, recouping Btu?s which would normally be exiting the stack, often paying for the E++Plus in a year or less!

       